Nearly a billion yuan! Zhejiang Hetou Town’s “Suger Baby’s Zero Direct Discharge Zone” EPC project bid for quality expansion project!

requestId:68629b525e4a30.70198015.

On June 12, the EPC project of the “Zero Direct Discharge Zone of Sewage” in Hetou Town, Zhejiang Province was publicly tendered, with a bidding budget of 91.5435.1 million yuan, and the construction scale: the total length of the newly built pipeline of this project is about 217km (D110~D800), and the construction is also provided to build inspection wells, chemical tanks, oil separators (public units), three wells and other ancillary buildings. The total area of ​​the upgrade area is about 1.4Sugar daddy76 Square kilometers.

Hetou Town’s “Zero Direct Discharge Area” Quality-Enhancing EPC Project Tendering Notice

1. Project Overview

Project Name:Hetou Town’s “Zero Direct Discharge Area” Quality-Enhancing EPC Project

Project Registration Number: Recruitment 2024082

Supervision Department: Luhai City Construction Project Tendering and Investment Affairs Intermediate

Guidelines: Luhai City Tendering [2024] No. 052

Project Consent Office: Luhai City Development and Renovation Bureau

Project Document No.: Development and Reform Base [2024] No. 113

Tender Unit (Tenderer): Luhai City Drainage Co., Ltd.

Sugar daddy

Escort manilaConstruction location: Hetou Town, this project has 17 administrative villages: Houtian Village, Qixing Village (including Xiaxi, Lantian Village, Shanti Village, Huangliheguangtou Natural Village), Yaozhai Village (including Lijiayuan and Xiaokeng Natural Village), Qianshan I, Qianshan II, Qianshan III, Qianshan IV (including Houzhen Natural Village), Zhongro Village (including Nianlu and Houshan Jiang Village Natural Village), Xiawan Village, Shangwan VillageSugar baby, Xixi Village (including Lingdong Village Tianran Village), Hetou Village (including Zhongduao, Yanxia Zheng and Gangyuan Natural Village), Xiaoshiling Village, Slag Treatment Station, Sanhua Treatment Center, Guomin Road, Hetou Village, and Guanxi Road in Dianqian Village.

Overview of construction scale and content: The total number of newly built pipelines in this project is about 217km (D110~D800), and is equipped with Sugar daddy to build inspection wells, chemical tanks, oil separators (public units), and 3 shantytown wells. Improve the overall area of ​​the areaThe amount is about 1.476 square kilometers.

Tender Scope: This bidding project is the EPC project of the “Zero Sewage Direct Discharge Zone” in Hetou Town.

1. Exploration, design, procurement, construction of this projectSugar baby, acceptance, handover, warranty and other services.

2. Construction drawing design (including paper review), required exploration and contact related specialized evidence and related review tasks.

3. The construction of this project includes but is not limited to: drainage projects, drainage repairs, rain and sewage separation reforms, mixed riser reforms, chemical tank reforms, public building unit reforms, and related data procurement and purchases. The specific project content is based on the final implementation plan.

4. The completion stage after the completion of this project and subsequent transfer, preparation, project defect repair and warranty services during the term of responsibility, etc.

Fund source and investment ratio: Financial grants

Tendering segments: 1

Package method: Public response from the bid? “A person is beautiful and can be heard singing.” Tags

Sugar daddy

Tender base or budget: 91.5435.1 million yuan, of which:

(1) Jian’an price quote: Project price bid control price is 90.4078 million yuanEscort manila, with the maximum bid limit of 79.5588.64 million yuan; (the maximum bid limit is 88% of the bid control price).

(2) Design fee: The maximum bid limit is 1.1357.1 million yuan.

Planning construction period: Completed within 360 days after the contract is signed.

The project has bidding conditions and has been prepared during the bidding and bidding for construction projects in Haishi City.

2Manila escort, applicant qualification request

Investor qualification request: The applicant must also have the following conditions:

1) Have comprehensive engineering design level A quality or a municipal administrative department level B or above or a municipal administrative (drainage engineering) professional level B or above;

2) Have a municipal public engineering construction first or above (for construction qualityThe “Zhejiang Construction Market Supervision Public Service System” has been under the “pass” status);

Price of the bidder: The bidder (the bidder (the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the contractor of the href=”https://philippines-sugar.net/”>Sugar babyExamination receipt report or completion acceptance form or completion acceptance form)】The stated time is standard), and complete the EPC performance of similar projects with a single contract price of RMB 22 million and above (similar itemsSugar daddy refers to the important content of the project, which is the municipal drainage pipe network or the small area drainage pipe network or the rain and sewage pipe network project, and is provided to a contract (scanned), b-tag notice book (scanned), c completion receipt record (or completion receipt report or completion acceptance form or completion acceptance certificate book or completion acceptance form). All the above information is added to the Pinay escortofficial seal. If the contract, the winning notice and completion verification certificate fail to fully realize the project size characteristics, the certificate information of the bidder’s certificate issued by the bidder or the certificate information of the official seal issued by the construction administrative department shall be attached, otherwise the business results will not be recognized.

Project responsible person qualification request:

Project responsible person: must be a design unit person, have registered public equipment engineer (supply to water and drainage professional) or first-class construction engineer (municipal engineering professional) or senior or above professional technical title (supply to drainage professional);

Design responsible person: must be a registered public equipment engineer (supply to water and drainage professional) ) qualifications, if the joint bid is submitted, the design responsible shall be appointed by the joint member who undertakes the design task;

Construction responsible person: if the registered first-class construction engineer (municipal engineering profession) qualification, the construction responsible person shall be appointed by the joint member who undertakes the construction task;

Project responsible person, design responsible person, and construction responsible person shall not serve each other simultaneously.

Purchaser must set up the staff andgar.net/”>Sugar baby has corresponding talents in terms of preparation, funds, etc.

This project accepts joint bidding;

The joint unit bidding time shall be provided to the joint bidding agreement, and the leader of the joint agreement shall have units of design qualificatio TC:

Categories:

No Responses

發佈留言

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *